WebFOCUS Online Help > ReportCaster Development and Administration > Creating and Maintaining a Schedule > Schedule Tab

Schedule Tab

In this section:

When you access the ReportCaster Development and Administration Interface, click the Create a New Schedule link to access the New Schedule - ReportCaster window. The Schedule tab is the first to display, as shown in the following image.

In the Schedule tab, specify the job description, the run interval, and the date and time you want the schedule to run. You can select to have the schedule run once or repeatedly on any day at any time. Uncheck the Enabled check box if you want the schedule to be inactive.

Tip: As a ReportCaster Administrator, you can define dates on which schedules cannot run or be set to run. For more information about defining blackout dates for your ReportCaster site, see Schedule Blackout Dates.

Enter the following information to create a new schedule or modify an existing schedule.

  1. In the Description field, type a descriptive name for the schedule. This description is used throughout ReportCaster to identify the schedule. After the schedule runs, the description appears in your list of schedules.
  2. From the Run Interval drop-down list, select how frequently to run the schedule. Possible values are:
  3. In the Start Time field, set the time you want the schedule to begin using the up or down arrow to the right of the field. (You can also place the cursor at the beginning of any time component and then type the new value over the old value.) The current time is the default start time. It applies only to the start date and does not apply to any date thereafter. If you select a time that is after the current time, the scheduled job will not run until the next instance of the start time that fits within the specifications of the schedule.

Top of page

Specifying Advanced Options for a Schedule

The Advanced window within the Schedule tab is where you can change all default values for a schedule, and create a secondary run interval within the day the schedule runs.

Click Advanced within the Schedule tab to change the default values for the following options:


Top of page

Reference: Creating a Secondary Run Interval

In the Advanced window within the Schedule tab, you have the option to create a secondary run interval within the day the schedule runs. You can apply the secondary run interval every n minutes or hours for a specified number of hours/minutes or until a specified time. This option is available for schedules that run every day(s), week(s), month(s), or year(s). The following image shows the Secondary run interval options.

Clicking the Apply secondary run interval check box activates the following options:

  • Every n [minutes|hours]. Applies the secondary run interval every n minutes or hours (in this example every 10 minutes) within the day the schedule runs.
  • Until time. The time up until which the secondary run interval will be applied. In this example, the schedule will be rerun every 10 minutes until 4:00 P.M.
  • Lasts for n hour(s) n minute(s). The duration, specified in hours/minutes, during which the secondary run interval will be applied. This option and the Until time option are mutually exclusive, so this option is inactive in this example.

Note: The secondary run interval is not validated when the schedule is created. Instead, validation is performed every time the schedule's NEXTRUNTIME is calculated when running within the secondary run interval. The secondary run interval cannot exceed the NEXTRUNTIME for the primary run interval. For example, a daily schedule cannot have a secondary run interval greater than Every 1 day(s). If a secondary run interval is scheduled to run after the schedule's next primary run interval, the secondary run interval is stopped and an error message is displayed to the user and written to the log file.

Click the Tasks tab to continue creating the schedule. For more information, see Creating a Task.


WebFOCUS